Kitime Wastewater Treatment Plants (WWTP) Earthwork Construction

photo_2025 11 29_00 49 58 1 e1764654604366
20251113_162721 scaled

Project Information

  • Project Owner: AAWSA- Addis Ababa Water and Sewage Authority
  • Contractor: FINOT Engineering and Trading Plc with CGC OVERSEAS CONSTRUCTION ETH., LTD , (CGCOC).
  • Project Location: Addis Ababa, Ethiopia
  • Funded by: World Bank(WB) and JICA
  • Each component is executed through careful siproper disposal, ensuring the groundworks arestruction in accordance with modern engineeriments. With a total project value exceeding 400 as a key investment in urban infrastructure and ment. The agreed schedule for completing this exwe have completed the project within 60 days 

Project Overview

This large-scale project involves extensive excavation and disposal works in preparation
for the construction of a complex wastewater treatment facility and supporting infrastructure. The work covers excavation for a wide range of critical components including
Treatment units ,Operational and utility buildings, and Safety and auxiliary systems